Work shall include direct replacement of finishes direct replacement of apartment kitchen, bathrooms, doors and window sashes.
1) Analysis of existing roof dunnage for new roof top equipment and design of existing steel dunnage modifications accordingly. 2) The Design of new steel dunnage platform for additional equipment.
1) Replacement of existing roofing on upper and lower-level roofs, not including the existing deck to remain. 2) Modification of existing and provision of new roof level access stairs as indicated.
Work shall include direct replacement of finishes direct replacement of apartment kitchen, bathrooms, doors and window sashes.
Mechanical Design for: 1) Replacement of chillers and demolition of cooling towers 2) Installing fully variable reheat hot water system 3) Upgrading BMS 4) Recovering waste heat from the cold storage...
1) Analysis of existing roof dunnage for new roof top equipment and design of existing steel dunnage modifications accordingly. 2) The Design of new steel dunnage platform for additional equipment.
1) Replacement of existing roofing on upper and lower-level roofs, not including the existing deck to remain. 2) Modification of existing and provision of new roof level access stairs as indicated.
Shp2 - filing for civil site work plumbing components in conjuction with new building b00848002-i1
Installation of scaffold as per drawings. scaffold shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Filing herewith for the renovation of an exisitng single family three story building .there is no change to use, egress, or occupancy.
Shp2 - filing for civil site work plumbing components in conjuction with new building b00848002-i1
Installation of scaffold as per drawings. scaffold shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Filing herewith for the renovation of an exisitng single family three story building .there is no change to use, egress, or occupancy.
Relocating ex. kitchen sink. relocating ex. lav, & exist bathtub on the existing bathroom. proposed an additional bathroom with, 1 lav, 1 toilet and 1 bathtub. proposed a new dishwasher at kitchen.no...
Propose to legalize 3 piece bathroom in the cellar and cap existing stove
Structural in conjunction with NB GC #B01202234-I1.
Propose to legalize 3 piece bathroom in the cellar and cap existing stove
Relocating ex. kitchen sink. relocating ex. lav, & exist bathtub on the existing bathroom. proposed an additional bathroom with, 1 lav, 1 toilet and 1 bathtub. proposed a new dishwasher at kitchen.no...
Install fire sprinkler system subsequent to GC (-I1) job. The system is hydraulically calculated.
Install fire sprinklers subsequent to GC (-I1) job. This system is hydraulically calculated.