Building Permits in ZIP 11204
Brooklyn, NY — 338 permits filed recently
338 permits
File plumbing work of 3-family building to install new/relocate plumbing fixtures and gas appliances as per plan. no change in use, egress or occupancy.
File to build new curb cut in front of property. no change in use, egress or occupancy.
File to build new curb cut in front of property. no change in use, egress or occupancy.
Renovation of existing cellar, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom, washer, dryer, boilers and hot water heaters on cellar; no change in use...
File to address ECB violation#39171585Y, remove existing illegal awning of existing first floor commercial space from west 10th Street as per plan. No change in use, egress, or occupancy.
Installing temporary construction fence in front of property for site safety.
Renovation of existing cellar, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom, washer, dryer, boilers and hot water heaters on cellar; no change in use...
File to address ECB violation#39171585Y, remove existing illegal awning of existing first floor commercial space from west 10th Street as per plan. No change in use, egress, or occupancy.
Installing temporary construction fence in front of property for site safety.
General renovation of 3-family building to remove partitions, replace windows, install new partitions, floor tiles, doors, and paint as per plan. plumbing work will file separately. no change in use,...
Erect (4) aluminum storefront cabinets; replacing existing cabinets
Proposed temporary construction fence filed herewith subsequent to nb b00767906.
Full demolition to a one story garage
Proposed new three story & cellar 1 family building. partitions as per plans.
Erect (4) aluminum storefront cabinets; replacing existing cabinets
Proposed new three story & cellar 1 family building. partitions as per plans.
Proposed temporary construction fence filed herewith subsequent to nb b00767906.
Full demolition to a one story garage
General renovation of 3-family building to remove partitions, replace windows, install new partitions, floor tiles, doors, and paint as per plan. plumbing work will file separately. no change in use,...
Minor construction work in 4-family building with replace sheetrock and painting in apt 1f, and replace all windows in each apartment as per plan and no change of use, egress, or certificate of occupa...