Building Permits in ZIP 11206
Brooklyn, NY — 664 permits filed recently
664 permits
Subsequent foundation and earthwork application filed herewith.
Installation of solar pv system. no change to use, egress, or occupancy.
Subsequent structural application filed herewith.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
SITE YARD WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
Subsequent underpinning application filed herewith.
Mechanical filing for Removal of existing steam piping and installation of new piping. Bldg 8 All as per plans filed herewith
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Herewith filing soe design plans for a 6-sty nb with proposed 1:1 excavation along exposure-3; and steel shoring on exposure-1. this application is filed in conjunction to dob bis application with job...
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of solar pv system. no change to use, egress, or occupancy.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Subsequent underpinning application filed herewith.
Subsequent structural application filed herewith.
SITE YARD WORK AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.
Mechanical filing for Removal of existing steam piping and installation of new piping. Bldg 8 All as per plans filed herewith
Herewith filing soe design plans for a 6-sty nb with proposed 1:1 excavation along exposure-3; and steel shoring on exposure-1. this application is filed in conjunction to dob bis application with job...
INSTALLATION OF NEW 8FT HIGH ALUMINUM FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. Application to be reviewed with the Development HUB.