Building Permits in ZIP 11207
Brooklyn, NY — 494 permits filed recently
494 permits
Proposed installation of steel lintels for new garage door opening, extension of parapets on both street frontages. No change to use, occupancy or egress under this application.
Proposed restoration of existing Curb Cut #2, as per plans.
General construction work for (4) exterior battery containment enclosures per BB 2025-009. No change to use, egress, or occupancy.
General construction work for (4) exterior battery containment enclosures per BB 2025-009. No change to use, egress, or occupancy.
Proposed restoration of existing Curb Cut #2, as per plans.
Proposed installation of steel lintels for new garage door opening, extension of parapets on both street frontages. No change to use, occupancy or egress under this application.
Full demolition of 3 story multi-family dwelling to comply with NYC HPD Emergency Declaration, DEC# 19775
No change in use, egress, & occupancy. herewith filing new mechanical application for proposed heating & cooling systems roof top.
Proposed installation of new Curb Cut#1 to access building.
Installation of solar panels, rooftop, grid tied, railed 7 modules, 2.87 KW
Proposed restoration of existing Curb Cut #3, as per plans.
CAP & remove gas piping from rear cottage and replace gas stove with electric stove. Cap & Remove Residential gas stove & kitchen sink in basement kitchen, remove existing gas boiler & hwh, filing to...
CAP & remove gas piping from rear cottage and replace gas stove with electric stove. Cap & Remove Residential gas stove & kitchen sink in basement kitchen, remove existing gas boiler & hwh, filing to...
No change in use, egress, & occupancy. herewith filing new mechanical application for proposed heating & cooling systems roof top.
Full demolition of 3 story multi-family dwelling to comply with NYC HPD Emergency Declaration, DEC# 19775
Proposed installation of new Curb Cut#1 to access building.
Installation of solar panels, rooftop, grid tied, railed 7 modules, 2.87 KW
Proposed restoration of existing Curb Cut #3, as per plans.
Modification to existing Plumbing System, Installation of a Sump Pump and 1 Sprinkler head for elevator modernization
Installation of supported scaffold for work location access