Skip to content
ZIP 11208

Building Permits in ZIP 11208

Brooklyn, NY 370 permits filed recently

370 permits

Other$46,000
158 RICHMOND STREET, Brooklyn, NY 11208

Remove and replace wall mounted Air condensing units in basement and first floor.

Thermo Tech Mechanical I*Charleston AlbertMar 30, 2026#B00987901-S1
Other$322,500
171 HALE AVENUE, Brooklyn, NY 11208

Proposed removal and installation of interior non-bearing and bearing partitions, fixtures, finishes, cabinetry and casework. No change in use, occupancy or egress under this application.

Williams Designs & ConstrKelly MiddletonMar 30, 2026#B01356150-I1
New Construction
570 ELDERT LANE, Brooklyn, NY 11208

Propose Foundation for a new building as per plan filed in conjunction with NB # B01196476. Foundation consists of piles, caps, wall footing, column footings, and grade beams supporting steel and conc...

Sd Builders And ConstructDavid SchwartzMar 30, 2026#B01196476-S5
Other
455 LINWOOD STREET, Brooklyn, NY 11208

Foundation and earthwork specifications filed in conjunction with gc application job #b01239985-i1

A.A.Z Enterprises CorpYitz FriedmanMar 30, 2026#B01239985-S5
Other
912 CRESCENT STREET, Brooklyn, NY 11208

Mechanical system for 3 story 6 family building

Zk Development CorpFahad FatehMar 30, 2026#B01197262-S4
New Construction
570 ELDERT LANE, Brooklyn, NY 11208

Propose Structural Work as per plan filed in conjunction with NB # B01196476.

Sd Builders And ConstructDavid SchwartzMar 30, 2026#B01196476-S4
Roofing$200,000
982 HEGEMAN AVENUE, Brooklyn, NY 11208

K202 : Remove and Replace (5) 3 Gas Vents, (6) 2 gas vents, (3) 1-1/2 gas vent, (1) 1 1/4 gas vent and (1) 1 gas vent. Also remove and replace 13 Roof Drains and Reflash and Extend 16

Varsity Plbg And Htg IncCharleston AlbertMar 30, 2026#B00789927-S3
Roofing$200,000
982 HEGEMAN AVENUE, BROOKLYN, NY 11208

K202 : Remove and Replace (5) 3 Gas Vents, (6) 2 gas vents, (3) 1-1/2 gas vent, (1) 1 1/4 gas vent and (1) 1 gas vent. Also remove and replace 13 Roof Drains and Reflash and Extend 16

VARSITY PLBG AND HTG INCCHARLESTON ALBERTMar 29, 2026#B00789927-S3
Other
912 CRESCENT STREET, Brooklyn, NY 11208

Mechanical system for 3 story 6 family building

Zk Development CorpFahad FatehMar 29, 2026#B01197262-S4
New Construction
570 ELDERT LANE, Brooklyn, NY 11208

Propose Structural Work as per plan filed in conjunction with NB # B01196476.

Sd Builders And ConstructDavid SchwartzMar 29, 2026#B01196476-S4
Roofing$8,900
1061 LIBERTY AVENUE, Brooklyn, NY 11208

Existing mechanical system (BIS Job#321461752) ductwork diffuser relocates as per new floor plan. Reuse existing roof mounted HVAC unit.

Kale Construction IncSaiful IslamMar 27, 2026#B01194283-S1
Other$18,000
478 ESSEX STREET, Brooklyn, NY 11208

Application to legalize the constructed new passageway to the cellar including staircase using cmu block & handrail installation as per plan to comply ecb violation #039163544h & #039163545j. no chang...

A1 Topline ConstructionMohammad IlyasMar 27, 2026#B01321473-I1
Other$1,000
553 COZINE AVENUE, Brooklyn, NY 11208

Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.

Phoenix Sutton Str IncPiotr SiwiecMar 27, 2026#B01375990-I1
Other$150,000
757 WORTMAN AVENUE, Brooklyn, NY 11208

Sidewalk Shed Installation

Raven Construction ServicCharleston AlbertMar 27, 2026#B01092080-I1
Other$150,000
757 WORTMAN AVENUE, Brooklyn, NY 11208

Sidewalk Shed Installation

Raven Construction ServicCharleston AlbertMar 26, 2026#B01092080-I1
Roofing$8,900
1061 LIBERTY AVENUE, Brooklyn, NY 11208

Existing mechanical system (BIS Job#321461752) ductwork diffuser relocates as per new floor plan. Reuse existing roof mounted HVAC unit.

Kale Construction IncSaiful IslamMar 26, 2026#B01194283-S1
Other$18,000
478 ESSEX STREET, Brooklyn, NY 11208

Application to legalize the constructed new passageway to the cellar including staircase using cmu block & handrail installation as per plan to comply ecb violation #039163544h & #039163545j. no chang...

A1 Topline ConstructionMohammad IlyasMar 26, 2026#B01321473-I1
Other$1,000
553 COZINE AVENUE, Brooklyn, NY 11208

Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.

Phoenix Sutton Str IncPiotr SiwiecMar 26, 2026#B01375990-I1
Other$203,000
58 DOSCHER STREET, Brooklyn, NY 11208

Filed for horizontal extension and conversion existing (1) family dwelling to (2) family dwelling as per plan. obtain new c.of o.

Akhtar Construction Co InAkhtar NewazMar 26, 2026#B01017609-I1
Other$203,000
58 DOSCHER STREET, Brooklyn, NY 11208

Filed for horizontal extension and conversion existing (1) family dwelling to (2) family dwelling as per plan. obtain new c.of o.

Akhtar Construction Co InAkhtar NewazMar 26, 2026#B01017609-I1