Building Permits in ZIP 11209
Brooklyn, NY — 335 permits filed recently
335 permits
INTERIOR RENOVATION OF EXISTING APARTMENT 1B and 3R, REPAIR PAINTS AND CHANGE KITCHEN CABINET. NO CHANGE IN PARTITION WALLS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Register (2) hot water heaters and replace gas piping as per plans. no change to use, occupancy or egress.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INTERIOR RENOVATION OF EXISTING APARTMENT 1B and 3R, REPAIR PAINTS AND CHANGE KITCHEN CABINET. NO CHANGE IN PARTITION WALLS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Register (2) hot water heaters and replace gas piping as per plans. no change to use, occupancy or egress.
Plumbing work. repairs at apt. # c3 due to fire as well as water damage repairs at apts # d3, # b3, # a1, # a3, as per plans attached to comply with dob violation # 032525c25-00512 and the partial vac...
Plumbing fixture with associated pipes for the existing two family building renovation.
Plumbing fixture with associated pipes for the existing two family building renovation.
Plumbing work. repairs at apt. # c3 due to fire as well as water damage repairs at apts # d3, # b3, # a1, # a3, as per plans attached to comply with dob violation # 032525c25-00512 and the partial vac...
Additions/modificaitions to existing plumbing system as per plans filed herewith.no change in use, egress or occupancy
Installation of plumbing work as per the plan filed herewith. no change in use, occupancy or egress.
Additions/modificaitions to existing plumbing system as per plans filed herewith.no change in use, egress or occupancy
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new combi. boiler on 2nd floor;new 2-pc restroom, washer, dryer, combi. boiler and hot water...
Front entrance relocated, new porch installed
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new combi. boiler on 2nd floor;new 2-pc restroom, washer, dryer, combi. boiler and hot water...
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
Front entrance relocated, new porch installed
Additions/modifications to existing plumbing system as per plans filed herewith. no change in use, egress or occupancy