Building Permits in ZIP 11209
Brooklyn, NY — 335 permits filed recently
335 permits
Herewith filing build out plans for renovation of interior first floor areas and second floor bathroom as shown in the plans. additional plans to be filed under separate dob filing. no changes to egre...
Repointing, lintel replacement, recaulk all fourside of window, sill replacement, parapet replacement work as per plan. no change in use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection
Herewith filing build out plans for renovation of interior first floor areas and second floor bathroom as shown in the plans. additional plans to be filed under separate dob filing. no changes to egre...
interior renovation of 2nd and 3rd floor, work includes replace wood floor, replace kitchen cabinet, replace bathroom and kitchen floor tile and replace sheetrock. no change in use, occupancy and egre...
interior renovation of 2nd and 3rd floor, work includes replace wood floor, replace kitchen cabinet, replace bathroom and kitchen floor tile and replace sheetrock. no change in use, occupancy and egre...
Interior renovation on an existing eating/drinking establishment. No change in use, occupancy or exit. C of O # 218750 Sept. 15, 1980.
Installation of outrigger for facade repair.
Interior renovation on an existing eating/drinking establishment. No change in use, occupancy or exit. C of O # 218750 Sept. 15, 1980.
Installation of outrigger for facade repair.
Partial renovation of an ex. mixed-use building with interior partition and plumbing work. scope also includes replacement of windows. plumbing under subsequent filing. no change in use, egress or occ...
Partial renovation of an ex. mixed-use building with interior partition and plumbing work. scope also includes replacement of windows. plumbing under subsequent filing. no change in use, egress or occ...
Interior renovations of units 1d, 2h, 3m and 6a on the 1st, 2nd, 3rd, and 6th floors. work includes new non-structural interior partitions, replacement of plumbing fixtures, and interior finishes.
Interior renovations of sub-cellar and cellar common areas including new interior communicating stair, new interior non-structural partitions and finishes, and replacement of plumbing fixtures.
Interior renovations of units 1d, 2h, 3m and 6a on the 1st, 2nd, 3rd, and 6th floors. work includes new non-structural interior partitions, replacement of plumbing fixtures, and interior finishes.
Interior renovations of sub-cellar and cellar common areas including new interior communicating stair, new interior non-structural partitions and finishes, and replacement of plumbing fixtures.
Remove 3 drinking fountains, relocate 3 existing fountains for ADA compliance, provide ADA fountain BF (3), DF w/Bubbler (6), remove existg LAV replace with ADA Lav (2), remove existg 4-station wash f...
Application filed for interior renovation and installation of mechanical systems in apartment 1b on the first floor, apartment 2b on the second floor, apartment 3b on the third floor, and apartment 4b...
Application herewith filed for the interior renovation of apartment #207 on the 2nd floor of an existing multi-family residence.
Installation of plumbing work as per the plan filed herewith. no change in use, occupancy or egress.