Building Permits in ZIP 11212
Brooklyn, NY — 627 permits filed recently
627 permits
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Temporary hoist run-back structure during new bldg construction, filed separately. run-back structure shall comply with ch #33 of the nyc bldg code. no change in use, occupancy or egress under this ap...
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
installation of underground piping
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Equipment use: dual 8000 # capacity personnel hoist during nb const, filed sep. hoist shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator app...
Installation of a temporary wooden construction fence
This application is being filed for general construction and structural work to convert the existing store into a dwelling unit.
New bathroom, kitchen & sprinklers for a new dwelling unit converted from a store
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of temporary chain link fence as per plans. chain link fence shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Installation of a temporary wooden construction fence
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this application.
Repair of building infrastructure and reconfiguration of apartment of 4 story multiple dwelling. No change in use, occupancy, or egress.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola