Building Permits in ZIP 11212
Brooklyn, NY — 614 permits filed recently
614 permits
installation of solar panels, rooftop, railed, grid-tied, 12 modules, 4.92 KW
Scope of work is solely for the installation of the solar electronic generating system. all other work is not to be relied upon as beingapproved and/or permitted by the nyc department of buildings.
Installation of plumbing fixtures along with related piping. installation of 2 domestic water heaters and pumps.
Install a new sprinkler and standpipe system throughout the new 12 story residence.
Provide all labor, material, equipment, permits, and accessories for the installation of the temporary standpipe system as shown on the drawings.
Replace existing sink and associated plumbing with new. Provide new Grease interceptor.
Installation of scaffold as per drawings. scaffold shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Install a new sprinkler and standpipe system throughout the new 12 story residence.
Installation of plumbing fixtures along with related piping. installation of 2 domestic water heaters and pumps.
Replace existing sink and associated plumbing with new. Provide new Grease interceptor.
Scope of work is solely for the installation of the solar electronic generating system. all other work is not to be relied upon as beingapproved and/or permitted by the nyc department of buildings.
Install a new sprinkler and standpipe system throughout the new 12 story residence.
Installation of scaffold as per drawings. scaffold shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
installation of solar panels, rooftop, railed, grid-tied, 12 modules, 4.92 KW
Provide all labor, material, equipment, permits, and accessories for the installation of the temporary standpipe system as shown on the drawings.
HUB Related filing NEW PLUMBING WORK TO ACCOMMODATE THE NEW BUILDING.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary personnel hoist as per plans. no change in use, egress or occupancy.
Sprinkler application filed herewith in conjunction to alt-co application b01231531-i1
P.S. 252-K: SUBSEQUENT FILING OF PLUMBING WORK TYPE. Areaway drainage replacement; installation of foundation drains and sump pump.