Building Permits in ZIP 11213
Brooklyn, NY — 320 permits filed recently
320 permits
Suspended Scaffold for Facade Restoration as Shown on Plans
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
OT: Exterior Masonry, Exterior Concrete, and Roofing Replacement work. Installation of waterproofing at foundation wall. EA: Removal of soil to allow for waterproofing and refiling after work completi...
Installation of temporary 8'-0 wood fence to be removed only after all work is completed.
Application filed for modification of the existing sprinkler system in conjunction with alteration co application number b00767200
Subsequent Plumbing work for renovation in apartment 3F and 4F
Subsequent Plumbing work for renovation in apartment 3F and 4F
Installation of temporary 8'-0 wood fence to be removed only after all work is completed.
Application filed for modification of the existing sprinkler system in conjunction with alteration co application number b00767200
Interior renovations to existing 2 1/2 story - 2 dwelling unit building. replacement/ relocation of existing plumbing fixtures. replacement of mechanical systems.
Interior renovation on cellar floor of existing building, general construction as per plan. no change in egress, use or occupancy.
Install new construction fence in conjunction with nb b00644691-i1
Install new construction fence in conjunction with nb b00644691-i1
Interior renovations to existing 2 1/2 story - 2 dwelling unit building. replacement/ relocation of existing plumbing fixtures. replacement of mechanical systems.
Interior renovation on cellar floor of existing building, general construction as per plan. no change in egress, use or occupancy.
Removal and replacement of existing duct and piping provide new motorized damper's to be interlocked with class room units . provide 1 new split system in MDF room.
Replacing roof, Masonry, and windows in kind. waterproofing existing structure.
Replacing roof, Masonry, and windows in kind. waterproofing existing structure.
Structural repairs to existing steel beans and concrete slab. replacement of existing parapet bracing.