Building Permits in ZIP 11214
Brooklyn, NY — 318 permits filed recently
318 permits
Erect new awning with copy. no change in use, egress or certificate of occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Verify and inspect installation of plumbing fixtures as per plan in conjunction with GC application #B01211540-I1, filed to complete job 994-84.
Renovation of existing cellar, 1st and 2nd floor with general construction: new partitions, doors, flooring and cosmetic work; no change in use, egress or occupancy under this application.
Hand demo of a steel metal frame accessory structure
Hand demo of a wood frame accessory structure
File to address ECB violation#39167804N, propose interior renovation with partition work and finish work as per plan. No change in use, egress, or occupancy.
Hand demo of a wood frame accessory structure
Renovation of existing cellar, 1st and 2nd floor with general construction: new partitions, doors, flooring and cosmetic work; no change in use, egress or occupancy under this application.
Hand demo of a wood frame accessory structure
Hand demo of a steel metal frame accessory structure
Hand demo of a wood frame accessory structure
File to address ECB violation#39167804N, propose interior renovation with partition work and finish work as per plan. No change in use, egress, or occupancy.
Pipe Scaffold Installation
Propose plumbing work of existing residential building as per plan. No change in use, egress, or occupancy.
Propose plumbing work of existing residential building as per plan. No change in use, egress, or occupancy.
12 foot high concrete construction enclosure for demos b01147401, b01147443, b01147452. no viewing panels or hunter green paint required as this was built prior to 7/1/2013 as per 3307.7.8 and 3307.7....
12 foot high concrete construction enclosure for demos b01147401, b01147443, b01147452. no viewing panels or hunter green paint required as this was built prior to 7/1/2013 as per 3307.7.8 and 3307.7....
Construction of new 6-story building, including concrete columns, beams, and foundations.
Propose renovation at 3rd floor of existing residential building with partition work and finish work as per plan. No change in use, egress, or occupancy.