Building Permits in ZIP 11215
Brooklyn, NY — 983 permits filed recently
983 permits
Filing herewith application to supersede BIS application 320414725 to renovate Apt 2 at 1st Floor. Plumbing will be filed under a subsequent application. No change to egress, use, or occupancy.
Propose reduce size of existing building and alter building to accomodate Gasoline Service Station with Convenience Store all as per plans filed herewith.
Installation of new gas fired equipment and plumbing fixtures file in conjunction with ALT CO #B01286184-I1
Filing herewith application to supersede BIS application 320414725 to renovate Apt 2 at 1st Floor. Plumbing will be filed under a subsequent application. No change to egress, use, or occupancy.
Installation of new gas fired equipment and plumbing fixtures file in conjunction with ALT CO #B01286184-I1
Installation of 8'h construction fence in conjunction with nb#321589027. there is no change occupancy, use or egress.
Underpinning work for new building.
Proposed plumbing work in conjunction to arch. designs, install new pl fixtures. no change in use, egress and occupancy.
Propose reduce size of existing building and alter building to accomodate Gasoline Service Station with Convenience Store all as per plans filed herewith.
Temporary 8' construction fence
Temporary plywood construction fence at rear yard in conjunction with horizontal addition work at rear.
Subsequent Plumbing for apartment 1B at 1st floor.
School playground upgrade including installation of new concrete and asphalt pavements, new safety surface and play equipment.
Installation of 200 ft of Temporary Construction Fence , at the building , No change of Use or Egress Or Occupancy of the building.
Upper vale-civil/sitework improvements at prospect park-vale of cashmere. no change to use, egress, or occupancy.
PROPOSED MECHANICAL WORK FOR A SINGLE FAMILY BUILDING. WORK AT CELLAR, BASEMENT, 1st FLOOR TO 3rd FLOOR, PENTHOUSE & ROOF. AS PER PLAN. IN CONJUNCTION WITH DOB NOW GC JOB#: B01333669-I1.
Proposed interior renovation on cellar, 1st, 2nd & 3rd floors and 4th floor. partition works as per plans. no change use or occupancy.
Upper vale-exterior landscaping/sitework improvements at prospect park-vale of cashmere. install low fence, exterior railings, pavers, benches, waste receptacles. no change to use, egress, or occupanc...
School playground upgrade including installation of new concrete and asphalt pavements, new safety surface and play equipment.
Subsequent Plumbing for apartment 1B at 1st floor.