Building Permits in ZIP 11215
Brooklyn, NY — 983 permits filed recently
983 permits
Construction plywood fence
Installation on temporary construction fence
Subsequent filing for support of excavation (soe) work in-conjunction to nb filing #b01209356-i1
Installation of temporary construction fence
Minor interior renovation on third floor and fourth floor in dwelling units in existing mixed use fourth story building. no change in bulk egress or occupancy.
Plumbing plans filed herewith to show new plumbing fixtures. No change to use, egress, or occupancy.
General Construction at basement indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.
Modifications to existing Sprinkler Systems as per plans filed herewith.
Convert existing 4 family Class A multiple dwelling to a 2 family dwelling, ALTERATION TO INCLUDE REMOVAL AND REPLACEMENT OF INTERIOR WALLS, PLUMBING FIXTURES AND APPLIANCES. SUB DOCS TO BE FILED FOR...
remove concrete pads in Consolidated Edison of NY Utility yard as per plans . No change to egress occupancy or use involved in this application
Mechanical work in relation to Alteration Type I building enlargement. New HVAC (split-system), duct and exhaust work. Related mechanical piping.
Interior renovation work to units #4l and 4r at 4th floor, include removing and installing new interior non-load bearing partitions, lighting and finish work. no change to use, egress or occupancy.
Interior renovation work to units #2l and 2r at 2nd floor & renovate common hallway from cellar to 002, include removing and installing new interior non-load bearing partitions, lighting and finish wo...
Installation of solar pv system. no change to use, egress, or occupancy.
Replace domestic water heaters and install new storage tanks.
Herewith filing to icap and remove all existing plumbing fixtures, along with the installation of all new gas fired equipment & plumbing fixtures as per plans for existing apartment #1 at second floor...
This application is for interior renovation to basement, first, second & third floors with minor changes to the rear facade extension openings at first floor. there shall be nochange in occupancy, use...
Interior plumbing upgrades and new installation to bathrooms, kitchens, and laundry room.
Floor framing reinforcement/replacement & bearing wall reconstruction for removal/relocation of existing internal bearing walls, steel frame design for enlargement of opening at existing rear masonry...
Subsequent plumbing application in conjunction with approved gc #b01190123-i1