Building Permits in ZIP 11217
Brooklyn, NY — 793 permits filed recently
793 permits
Mechanical application filed for installation of new hvac system on cellar, basement, first fl, 2nd, 3rd and roof
Hereby filing for the iinterior renovation of bathrooms and kitchen (installation of fixtures). no change to use occupancy or egress.
Minor partition work with general carpentry in apt 2. No Change to use, bulk or egress
Replace all existing roof drains with new roof drains, piping and insulation. replace all existing scupper drains & piping. replace vent piping.
Filing for interior modifications to create two separate commercial spaces within the existing footprint. Scope includes minimal partition work and the construction of a new entrance. No changes to eg...
Replace all existing roof drains with new roof drains, piping and insulation. replace all existing scupper drains & piping. replace vent piping.
Subsequent filing for structural works with new concrete footings for existing columns at cellar, a new slab-on-grade at cellar, and new wood posts and lvl beams at proposed opening in basement.
Mechanical application filed for installation of new hvac system on cellar, basement, first fl, 2nd, 3rd and roof
File suspended scaffold outrigger systems for facade restoration and inspection.
Hereby filing for the iinterior renovation of bathrooms and kitchen (installation of fixtures). no change to use occupancy or egress.
Minor partition work with general carpentry in apt 2. No Change to use, bulk or egress
Installation of temporary construction chain link fence. no change in use, egress or occupancy under this application.
Interior renovation of apartments 1, 2,3 & 4. No change to use, occupancy or egress under this application.
Herewith filing a construction fence permit as per plans. No change of use, egress or occupancy.
Filing plumbing application subsequent to the primary application B00997529-I1
Replacement of chiller heater on the rooftop with a total capacity of 120.4 kbtu/h. no change to egress, use, or occupancy.
Temporary Shoring
New heating system, bathroom and kitchen exhaust fans in apartments 1, 2, 3 & 4.
Installation of temporary construction chain link fence. no change in use, egress or occupancy under this application.
Installation of temporary construction chain link fence. no change in use, egress or occupancy under this application.