Building Permits in ZIP 11218
Brooklyn, NY — 372 permits filed recently
372 permits
Proposed interior renovation of an existing 2-family building. Work includes minor partition work and finish work per plan. No change in use, egress, or occupancy.
Replace existing bathroom fixtures, install a wall-mounted electric hot water heater, and install suspended unit heaters as per drawings. No change in egress use or occupancy.
Fence application filed in conjunction to alt1
Filing for fence application in conjunction to atl1
Install temporary construction fence forwith interior renovations under nb job #b01355516-i1
Replacement (2) combination gas/oil burners on (2) existing low pressure boilers. no change in means of egress use group or occupancy.
Filing plumbing application to provide pl new fixtures and existing pl fixtures to be replaced
Interior renovations consisting of interior demolition and general construction to an existing office building. no change to use, egress or occupancy
Interior renovations consisting of interior demolition and general construction to an existing office building. no change to use, egress or occupancy
Replacement (2) combination gas/oil burners on (2) existing low pressure boilers. no change in means of egress use group or occupancy.
Filing plumbing application to provide pl new fixtures and existing pl fixtures to be replaced
First floor installation of lavatory in bathroom and 3-compartment sink in kitchen. cellar installation of hand sink, 3-compartment sink and electric hot water heater. no change in use, egress or occu...
Renovation of exisiting 1 family house as per plan Partitions and finishes, no change to use, egress or occupancy under this application.
Interior renovation including non-structural layout modifications, including partitions & replacement of ex. slab (not to be lowered below level of ex. foot'g - no underpinning or structural work prop...
Hereby filing for the renovation of 1st & 2nd floor (installation of plumbing fixtures). no change in use, egress or occupancy.
Horizontal extension at rear of existing 1st & 2nd floors with new bulkhead & penthouse. convert from 2-family to 1-family residential building. obtain new certificate of occupancy.
Interior renovation including non-structural layout modifications, including partitions & replacement of ex. slab (not to be lowered below level of ex. foot'g - no underpinning or structural work prop...
First floor installation of lavatory in bathroom and 3-compartment sink in kitchen. cellar installation of hand sink, 3-compartment sink and electric hot water heater. no change in use, egress or occu...
Horizontal extension at rear of existing 1st & 2nd floors with new bulkhead & penthouse. convert from 2-family to 1-family residential building. obtain new certificate of occupancy.
Hereby filing for the renovation of 1st & 2nd floor (installation of plumbing fixtures). no change in use, egress or occupancy.