Building Permits in ZIP 11220
Brooklyn, NY — 536 permits filed recently
536 permits
Interior modification of an existing office area including installation of new non-bearing wall and doors. no change in use, egress or occupancy.
Installation and provisions of systems, equipment and services for a pre-k center, including electric cabinet unit heaters, perimeter electric wall pressed convectors,split system air-cooled heat reco...
Proposed support of excavation work for a (2) stories residential building horizontal extension
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Remove (1) sink and (1) 3-pc bathroom; Install (1) lavatory, (1) water closet and (1) shower in the Cellar. To remedy ECB violation #35724804R. No change in use, occupancy or egress.
Proposed mechanical work in conjunction with alt-co nb job # b01169931-i1.
Minor alteration to existing sprinkle heads only. no change to existing use, egress or occupancy.
Proposed new plumbing fixtures, new sprinkler heads and relocate existing sprinkler heads. no change in use, egress or occupancy.
Interior demolition of non-structural partition and finishes. No change in use, egress and occupancy.
Renovation of existing space to accommodate mammography and ultrasound suite.
Installing temporary construction fence as per plan, conjunction with job #b01152515-i1. no change in use, egress or occupancy.
File construction work of existing store to remove partitions, install new floor tiles, partitions, drop ceiling and interior finishes as per plan. mechanical work to install commercial kitchen hood e...
File construction work of existing store to remove partitions, install new floor tiles, partitions, drop ceiling and interior finishes as per plan. mechanical work to install commercial kitchen hood e...
Use of suspended scaffold using the permanently installed davit system during new building construction, filed separately. suspended scaffold shall comply with ch 33 of the nyc bc. no change in use, o...
Plumbing scope of work for one ada bathroom renovation and two new bathrooms one for first floor and mezzanine level. gas meter upgrade and gas piping for spray booth heating unit. new sprinkler rpz a...
Modify ductwork in mammography suite
Plumbing scope of work for one ada bathroom renovation and two new bathrooms one for first floor and mezzanine level. gas meter upgrade and gas piping for spray booth heating unit. new sprinkler rpz a...
Installing temporary construction fence as per plan, conjunction with job #b01152515-i1. no change in use, egress or occupancy.
File construction work of existing store to remove partitions, install new floor tiles, partitions, drop ceiling and interior finishes as per plan. mechanical work to install commercial kitchen hood e...
Interior demolition of non-structural partition and finishes. No change in use, egress and occupancy.