Building Permits in ZIP 11220
Brooklyn, NY — 535 permits filed recently
535 permits
General renovation of an existing 3 story 2-family building with repair/replace/new partition, door, ceiling, floor, painting work as per plan. no change in use, egress or occupancy.
Renovation of exist. residential house, repair/replace/new partition, door, ceiling, floor, stair, painting, canopy, roof as per plan. no change in use, egress or occupancy.
Proposed installation of debris chute as per plans. chute shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Modification to Verizon site. Remove 2 antennas, replace 2 antennas, install 7 antennas, remove 4 RRH units, relocate 2 GPS antennas and install 2 GPS antennas, remove cabinet, install new platform wi...
Provide Five story School with Cellar including new water services sanitary, vent, and storm piping systems. Cellar is provided with sewage ejector.
Install new commercial kitchen plumbing fixtures and gas equipment in 1st floor of the existing 3 story building. plumbing works as per plan. no change in egress, use, or occupancy.
In conjunction with alt job 301770215. install ductless split-system heat pump unit for commercial space at 814 & 816a, install refrigeration condenser unit for walk-in cooler at 816a
1. this application is filed to cure the 2 ecb violations issued 08/15/2025, namely: doing work without a permit, framing/replacing partitions, and general renovation on cel, 1st, 2nd and attic floors...
In conjunction with alt job 301770215. install ductless split-system heat pump unit for commercial space at 814 & 816a, install refrigeration condenser unit for walk-in cooler at 816a
Proposed installation of debris chute as per plans. chute shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Modification to Verizon site. Remove 2 antennas, replace 2 antennas, install 7 antennas, remove 4 RRH units, relocate 2 GPS antennas and install 2 GPS antennas, remove cabinet, install new platform wi...
Install new commercial kitchen plumbing fixtures and gas equipment in 1st floor of the existing 3 story building. plumbing works as per plan. no change in egress, use, or occupancy.
1. this application is filed to cure the 2 ecb violations issued 08/15/2025, namely: doing work without a permit, framing/replacing partitions, and general renovation on cel, 1st, 2nd and attic floors...
Provide Five story School with Cellar including new water services sanitary, vent, and storm piping systems. Cellar is provided with sewage ejector.
Temporary systems scaffold as per drawings. systems scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
File to plumbing as per plan, conjunction gc application #b01380259-i1 . no change in use, egress or occupancy.
Installing 8' height temporary construction fence as per plan. construction work filed under job #b01374559-i1. no change in use, egress or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
File plumbing work with installation of new plumbing fixtures and gas appliances as per plan in conjunction with construction work #b01374559-i1. no change in use, egress or occupancy.