Building Permits in ZIP 11222
Brooklyn, NY — 566 permits filed recently
566 permits
Installation of new plumbing system to include domestic water electrical heaters, piping distribution, storm and sanitary disposal systems; demolition and removal of existing plumbing system as per pl...
Enterior renovation to 1st floor retail and 2nd floor apartment. and addition of safetyrailing. no change to use, egress, or occupancy.
Installation of construction fence at sidewalk as per drawings in connection with job # b01122406-i1filing for temporary construction fence, no change in use, occupancy egress or bulk under this appli...
Installation of constrcution fence at sidewalk as per drawings in connection with job #b01218894-i1.
Interior renovation in conjunction with rear extension at second floor of an existing 2-story, semi-detached single-family private dwelling. work includes removal and installation of interior partitio...
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Mechanical demo and new installation work of mini split heat pump system for heating & cooling in existing dwelling units. No change in use, occupancy or egress proposed under this application.
Interior demo in the multi-family walk-up building at cellar, 1st, 2nd, 3rd floor, slab replacement as per plans filed herewith. no change in use, egress and occupancy.
Structural work in conjunction with building enlargement. BACKFILL AND COMPACT SOIL NEAR BUILDING FOUNDATION TO ADDRESS VIOLATION 39109915K AND 39083262J. No change in use, egress and occupancy
Install one mini split hvac unit for heating and cooling. install bathroom exhaust fan. no change to use, occupancy or egress. related gc job #b00954109-i1, related pl job #b00954109-s2, st job #b0095...
Mechanical demo and new installation work of mini split heat pump system for heating & cooling in existing dwelling units. No change in use, occupancy or egress proposed under this application.
Interior demo in the multi-family walk-up building at cellar, 1st, 2nd, 3rd floor, slab replacement as per plans filed herewith. no change in use, egress and occupancy.
Structural work in conjunction with building enlargement. BACKFILL AND COMPACT SOIL NEAR BUILDING FOUNDATION TO ADDRESS VIOLATION 39109915K AND 39083262J. No change in use, egress and occupancy
Install one mini split hvac unit for heating and cooling. install bathroom exhaust fan. no change to use, occupancy or egress. related gc job #b00954109-i1, related pl job #b00954109-s2, st job #b0095...
Interior renovation in conjunction with rear extension at second floor of an existing 2-story, semi-detached single-family private dwelling. work includes removal and installation of interior partitio...
Installation of constrcution fence at sidewalk as per drawings in connection with job #b01218894-i1.
Installation of hvac roof top units as per plans herewith. no change in building use, occupancy and egress.
Installation of plywood construction fence as per plan.there is no change in use, occupancy, or means of egress under this application
Structural filing in conjuncttion with alt-1 321775888.
Installation of hvac roof top units. no change in building use, occupancy and egress.