Building Permits in ZIP 11224
Brooklyn, NY — 203 permits filed recently
203 permits
Install a new air conditioning system in Apartment 23P, including (1) outdoor condensing unit, (4) indoor air handling units, refrigerant piping, drainage, and control system. All work per approved pl...
Filing for limited exterior repairs. No change in use, egress, or occupancy.
PS 188K: Plumbing work to relocate gas pipe, add 2 floor drains, trap primer and 1 hose bib. Sprinkler work to reroute a section of 2-inch pipe. No change to use, egress or occupancy.
Filing herewith for Support of excavation work as per plans filed herewith.
PS 188K: Plumbing work to relocate gas pipe, add 2 floor drains, trap primer and 1 hose bib. Sprinkler work to reroute a section of 2-inch pipe. No change to use, egress or occupancy.
Filing herewith for Support of excavation work as per plans filed herewith.
Equipment use: dual 7000 # capacity personnel hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator a...
Equipment use: dual 7000 # capacity personnel hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. elevator a...
Installation of gas piping to existing fixtures in the main feed room. No change in use, egress, or occupancy
Cap and remove existing residential kitchen sinks and cooking stove from 1st,2nd and 3rd floor.. remove existing 3 gas meter in cellar and reconnect all existing gas piping from combo hwh/boiler, drye...
Replace (3) domestic hot water heater exchangers with (2) domestic hot water heat exchangers in building no. 3.
Cap and remove existing residential kitchen sinks and cooking stove from 1st,2nd and 3rd floor.. remove existing 3 gas meter in cellar and reconnect all existing gas piping from combo hwh/boiler, drye...
Replace (3) domestic hot water heater exchangers with (2) domestic hot water heat exchangers in building no. 3.
Installation of gas piping to existing fixtures in the main feed room. No change in use, egress, or occupancy
Outriggers system installation and material hoist for facade repairs. No change in use, egress, or occupancy under this application.
Replace (2) domestic hot water heat exchangers with (1) domestic hot water heat exchanger in building no. 4.
Support of Excavation (SOE) as per plans filed
Outriggers system installation and material hoist for facade repairs. No change in use, egress, or occupancy under this application.
Replace (2) domestic hot water heat exchangers with (1) domestic hot water heat exchanger in building no. 4.
Support of Excavation (SOE) as per plans filed