Building Permits in ZIP 11230
Brooklyn, NY — 266 permits filed recently
266 permits
plumbing filing in conjunction with NB applicaotn
Install a temporary 8'-0 high construction fence in conjunction with ALT CO #B00946568
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
North roof replacement
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
North roof replacement
Subsequent application filed herewith for plumbing work type, installation of new plumbing fixtures, coldand hot water pipes, in conjunction to alt job b01061094-i1
Interior renovation of existing 1st floor and 2nd floor areas. no change in use, occupancy, or egress.
Interior renovation of existing 1st floor and 2nd floor areas. no change in use, occupancy, or egress.
Proposed facade restoration as per plans no change to use egress or occupancy.
Proposed facade restoration as per plans no change to use egress or occupancy.
Soe work for existing two story building; proposed horizontal enlargement and cellar slab to be lowered as per plans.
Underpinning and vertical enlargement of existing foundation walls and footing
Soe work for existing two story building; proposed horizontal enlargement and cellar slab to be lowered as per plans.
Underpinning and vertical enlargement of existing foundation walls and footing
extend first and second floor at rear . Application filed to rectify violation #'s 39133495N ; 39133494L
extend first and second floor at rear . Application filed to rectify violation #'s 39133495N ; 39133494L
Job filed to remove 40x30 1-story non-load bearing partitions and related construction fence in the backyard, and restore it to its original condition to remove ecb#39542036l & 39542660p.no change in...
Proposed removal of an existing 1 family building on floors: partial cellar,1,2,attic and roof. Work includes demolition of existing fixtures, finishes, casework, windows, doors, floors & bearing/non-...
Installation of ballast mounted PV solar energy system on roof. No change of use, egress, or occupancy.