Building Permits in ZIP 11231
Brooklyn, NY — 591 permits filed recently
591 permits
Removal of ex. site pavt's, curb wall, and fence in conjuction with renovated playyard entrance ramp. provide new pavt's, curb wall, fencing and railings for ada compliant entrance ramp.
Combination of apts filed under tppn 3/97. no change to use, occupancy or egress.
Remove and install plumbing fixtures.
Filing herewith to PROVIDE ELECTRICAL CLOSET FOR RELOCATED EQUIPMENT., AN ELEVATED STEEL FRAMED BOILER ROOM,AND A NATURAL GAS OPTIONAL STANDBY POWER GENERATOR ON STEEL PLATFORM.
Filing herewith to PROVIDE ELECTRICAL CLOSET FOR RELOCATED EQUIPMENT., AN ELEVATED STEEL FRAMED BOILER ROOM,AND A NATURAL GAS OPTIONAL STANDBY POWER GENERATOR ON STEEL PLATFORM.
Remove and install plumbing fixtures.
Masonry facade work, and sealant application as per plans. No change to use, egress, or occupancy.
Perform minor interior partition demolition & construction inconjunction with conversion to two family dwelling. remove one kitchen, relocate kitchen from 3rd to 1st floor. remove roof hatch & ladder...
Structural dunnage support for RTU on roof.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy or egress under this application.
Installation of a temporarily heavy-duty sidewalk shed, supported scaffold and needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or oc...
Installation of a temporarily heavy-duty sidewalk shed, supported scaffold and needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or oc...
Subsequent filing for structural work
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Perform minor interior partition demolition & construction inconjunction with conversion to two family dwelling. remove one kitchen, relocate kitchen from 3rd to 1st floor. remove roof hatch & ladder...
Masonry facade work, and sealant application as per plans. No change to use, egress, or occupancy.
Structural dunnage support for RTU on roof.
Subsequent filing for structural work
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy or egress under this application.