Building Permits in ZIP 11231
Brooklyn, NY — 597 permits filed recently
597 permits
Proposed self underpinning construction filing in conjunction with alt-co nb job#: b01278030-i1.
Plumbing work in conjunction with new 20-story mixed use building.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Plumbing work in conjunction with new 20-story mixed use building.
Replace deficient joists wall reinforcement, and new AC dunnage on roof. No change to use, egress or occupancy.
Installation of pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Proposed self underpinning construction filing in conjunction with alt-co nb job#: b01278030-i1.
Installation of sprinkler and standpipe systems.
Plumbing work at basement, 1st, 2nd floors, Roof and osp indicated on drawings filed herewith No change in Use egress or Occupancy under this application
Plumbing work at basement, 1st, 2nd floors, Roof and osp indicated on drawings filed herewith No change in Use egress or Occupancy under this application
Convert from 3 to 1 dwelling unit, vertical and horizontal extension on existing 2 story with basement and cellar building, remove rear wall for rear yard extension, front facade to remain and be repa...
Convert from 3 to 1 dwelling unit, vertical and horizontal extension on existing 2 story with basement and cellar building, remove rear wall for rear yard extension, front facade to remain and be repa...
Proposed installation of temporary pipe scaffold stair tower as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this applicati...
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Proposed to convert the existing four-family to one-family house with general construction works as shown on plans. obtain a new c of o. all related worktypes filed subsequently.
New Central HVAC installation
Renovation of the 2nd, 3rd, and 4th floor of an existing multi-family (5) story townhouse with cellar.
Plumbing application filed herewith in conjunction to nb application #b01256795-i1
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.the sidewalk shed at court street and douglass street elevations.
Proposed to convert the existing four-family to one-family house with general construction works as shown on plans. obtain a new c of o. all related worktypes filed subsequently.