Building Permits in ZIP 11233
Brooklyn, NY — 406 permits filed recently
406 permits
Vetrical enlagerment of existing 1-story community facility building. obtain a new c of o.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Vetrical enlagerment of existing 1-story community facility building. obtain a new c of o.
Installation of Sprinkler System
Subsequent foundation application in conjunction with approved gc #b01259976-i1
Filing herewith for the installation of air cooled split system heat pump system throughout building and installation of bathrooms exhaust system terminating at roof.
Subsequent support of excavation application #b01259976-i1
Filing for temporary construction fence
Hereby filing for the interior renovation of the ground floor commercial space in a mixed use building (installation of plumbing fixtures). no change in use, egress or occupan
Subsequent support of excavation application #b01259976-i1
Filing herewith for the installation of air cooled split system heat pump system throughout building and installation of bathrooms exhaust system terminating at roof.
Installation of Sprinkler System
Filing for temporary construction fence
Subsequent foundation application in conjunction with approved gc #b01259976-i1
Proposed interior renovation of an existing three story + cellar residential use building to address violation numbers: 34985151H, 34985449K . No change to use, egress or occupancy with this applicati...
Proposed interior renovation of an existing three story + cellar residential use building to address violation numbers: 34985151H, 34985449K . No change to use, egress or occupancy with this applicati...
Addition of deck at First floor with stair to yard, plus one glazed door at exterior wall at deck level.
Addition of deck at First floor with stair to yard, plus one glazed door at exterior wall at deck level.
Installation of solar panels, rooftop, grid tied, railed, 16 modules, 6.56 KW
Suspended scaffold in order to perform facade inspections and investigative probes. No change in use, occupancy or egress under this application.