Building Permits in ZIP 11236
Brooklyn, NY — 265 permits filed recently
265 permits
Structural repair and maintenance to masonry / concrete on existing building. No change in use, egress or occupancy.
Installation of temporary construction fence in conjunction w/fd applications & nb applications to be filed.
Filing for PAA to add another phase, plywood fence details, and chain link fence details on concrete.
Exterior facade repairs and waterproofing. No change in use, egress or occupancy. Sidewalk shed filed under separate application
Application filed herewith for interior demolition work to an existing three story + cellar building
Temporary suspended scaffold as per drawings during facade repairs filed separately under application# b01276729. suspended scaffold shall comply with ch 33 of the nyc bc. no change in use, occupancy...
Plumbing application filed herewith in conjunction to nb application b01246023-i1
installation of solar panels, rooftop, railed, grid-tied, 9 modules, 3.69 KW
Temporary suspended scaffold as per drawings during facade repairs filed separately under application# b01276718. suspended scaffold shall comply with ch 33 of the nyc bc. no change in use, occupancy...
Temporary suspended scaffold as per drawings during facade repairs filed separately under application# b01276718. suspended scaffold shall comply with ch 33 of the nyc bc. no change in use, occupancy...
Plumbing application filed herewith in conjunction to nb application b01246023-i1
Temporary suspended scaffold as per drawings during facade repairs filed separately under application# b01276729. suspended scaffold shall comply with ch 33 of the nyc bc. no change in use, occupancy...
installation of solar panels, rooftop, railed, grid-tied, 9 modules, 3.69 KW
New Building .Application field to construct new warehouse UG IX(A) (formerly 16D), with mezzanine, loading berths and open accessory parking. Application filed in conjunction with subsequent jobs for...
Retrofit existing schoolyards to include green infrastructure (gi) that will manage stormwater runoff from the tributary impervious surfaces. the work is part of nyc's gi program with the primary goal...
Retrofit existing schoolyards to include green infrastructure (gi) that will manage stormwater runoff from the tributary impervious surfaces. the work is part of nyc's gi program with the primary goal...
Installation of temporary construction fence for NYCDEP contract GI-CONS-3
installation of solar panels, rooftop, railed, grid-tied, 19 modules, 7.79 KW
installation of solar panels, rooftop, railed, grid-tied, 19 modules, 7.79 KW
Installation of temporary construction fence for NYCDEP contract GI-CONS-3