Building Permits in ZIP 11238
Brooklyn, NY — 791 permits filed recently
791 permits
Modification to existing Verizon site. Replace 2 antennas, relocate 2 antennas, remove 1 antenna, install 5 antennas, replace 6 RRH units, install 2 GPS antennas, remove 1 cabinet, install 1 cabinet.
Modification to existing Verizon site. Replace 2 antennas, relocate 2 antennas, remove 1 antenna, install 5 antennas, replace 6 RRH units, install 2 GPS antennas, remove 1 cabinet, install 1 cabinet.
Installation of temporary suspended scaffold equipment.
Proposed exterior facade restoration as per plans filed herewith.no change in use, egress or occupancy.
Application to reconfigure Unit 11B and 11C on 11th floor, interior renovation in Unit 11C. Partition work as per plan. No change in use, occupancy or exit.
Interior fit-out for nail salon & cellar storage. scope: new non-structural partitions. no change to use, egress, or occupancy.
Plumbing work filed in conjunction with renovation to ex. apt 1n on the first floor. install plumbing fixtures & related plumbing piping.
Interior and exterior church renovation including roof, windows work, and new elevator as per plans filed herewith. no change to use, egress, or occupancy.
Proposed interior renovation for apt#e16. work includes minor partition and interior finishes as per plans. no change in use, egress, or occupancy.
Filing for mechanical work to replace hvac condenser on the roof. no change in use, means of egress or occupancy in this application.
Separation of apartments combined under DOB Job No. 320410845. Work includes reinstallation of a kitchen in apartment 3C in the previous location.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Filing for mechanical work to replace hvac condenser on the roof. no change in use, means of egress or occupancy in this application.
Proposed interior renovation for apt#e16. work includes minor partition and interior finishes as per plans. no change in use, egress, or occupancy.
Separation of apartments combined under DOB Job No. 320410845. Work includes reinstallation of a kitchen in apartment 3C in the previous location.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Interior and exterior church renovation including roof, windows work, and new elevator as per plans filed herewith. no change to use, egress, or occupancy.
Plumbing work filed in conjunction with renovation to ex. apt 1n on the first floor. install plumbing fixtures & related plumbing piping.
Installation of pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Propose subsequent plumbing work filed in conjunction with nb job #b00764297-i1