Building Permits in ZIP 11238
Brooklyn, NY — 791 permits filed recently
791 permits
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applica...
Interior renovation to show conversion of children school to 5 family house as per plans filed herewith. change to certificate of occupancy requested.
Alterations to existing apartment
Subsequent filing for plumbing installation in an existing two family house as per the plans filed herewith. No change in use, egress or occupancy.
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applica...
Application filed to show conversion of 5 familyhouse to 3 family house as per plans filed herewith. change to certificate of occupancy requested.
Interior renovation to show conversion of children school to 5 family house as per plans filed herewith. change to certificate of occupancy requested.
Installation of temporary construction fence as per plans. no change in use, occupancy, or egress under this application.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Herewith filing for mechanical modifications in conjunction with interior retail fit-out per plans. no change in use, occupancy or egress under this application.
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Minor general construction work on the 8th and 10th floors as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
Plumbing work in conjnction with renovation of 5-story plus cellar townhhouse. new plumbing fixtures with san, vent, hot/cold water connections to plumbing risers
Installation of the new concrete pads for mech. equipment in tank rooms. installation of new areaway. extension of existing sump pit.
Main Roof Replacement, 7th Floor Terrace Roof Replacement, Mezzanine Roof Replacement, Localized Facade Cladding General Repairs
Renovation of cellar mechanical equipment room - nycha boilers
Structural work to accommodate facade repair including framing and replacement of concrete balconies as per plans.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Herewith filing for mechanical modifications in conjunction with interior retail fit-out per plans. no change in use, occupancy or egress under this application.