Building Permits in ZIP 94110
San Francisco, CA — 509 permits filed recently
509 permits
re-roofing. no hotworks. ref#: 202602256535.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
legalize existing type 1 kitchen hood/duct system serving existing cooking equipment.
unit 201: administrative permit to remove first floor from scope of work. pipe no longer needs th be rerouted on first floor. ref#: sprinkler pa#: 202501138175.
to comply with nov #202649619: plumupdate outlets in kitchen to gfci, update bathroom gfci and switch, cut concrete floor and patch flooring tile/update/fix grouts. dry wall patch in bathroom, paint b...
drywall installation single layer of drywal or ceiling throughout, some walls, patch over kitchen cabinets & laundry room 1 wall (double layer), mu, tape, level 4 finish cover & protect clean debris
replacing 3 roof top package units withy like for like replacments. two 5 ton capacity and one 4 ton capacity. these are ac replacments.
unit a: in kind bathroom remodel due to water damage, new tiles. water mitigation and drying. drywall replacement and painting. repairs to sink, vanity, toilet. comply to nov#: 202651725
unit#3: replace 10 street facing windows, same opening, same location, no size change, material is wood alum clad u.fact,.27
revision to pa 202402296863 add/expand window at facade & on south side of home. bathroom layout revision, no change in plumbing fixtures
interior remodeling & replacing the existing, cantilevered deck, like-for-like, on the 2nd floor of 3 units building.
*priority*leveling entry threshold at the front entrance & associated regrading of the s/w and parking drive aisle.1/f:convert 2 (e) isolation rooms into seclusian rooms with accessible restrooms.reno...
replace 5 windows with the same size and style. all windows visible from the street and vinyl material. windows on 2nd floor. u factor max 0.30.
replace damaged rear stair in-kind
reroofing no hot works.
replace window in-kind, same opening. remove carpet and install new hardwood floor in 2 bedrooms. change toilet, vanity and (e) shower in bathroom, tile work and painting.
common area: upgrade 5 sub panels and breakers and replace knob and tube with romex. remove and replace sheetrock and insulation to access new wiring. 355 bartlett: replace 1 p trap and 1 kitchen sink...
interior remodel to include kit. and bathroom remodel at the upper level. relocate int. stair case. new family room, study and 2 new bathrooms on the lower level. remodel existing rear yard deck. repl...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)