Building Permits in ZIP 94110
San Francisco, CA — 509 permits filed recently
509 permits
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
2nd story -kitchen remodel: replace(e) cabinets and tile floor. install(n) range, range hood and sink. relocate one door by 14 inches. install new lighting & controls. back porch: replace water damage...
convert one parking spot to a laundry room and storage. convert a second parking spot into enclosed parking.
re roofing no hot works
revision to 202506259416. interior remodel of 3rd floor with added electrical scope per revised plans. work includes installation of new lighting fixtures under upgrade to electrical service panel.
revision to pa 202512222407 do voluntary strengthening in the kitchen area by adding plywood shear wall. kitchen remodel under separate pa 202601073348
re-roofing with hot works
renovate 2 bathrooms in place, redo the bath/shower, change the vanity and toilet, re-tile the wall and floor. comply with nov#201635681. items# 3, 4, 7 and 9 (1)
1st floor re-setback of front face, with new entry door and re-building of stairs. 1st floor replacement of concrete slab, with addition of french drains. 1st floor new bathroom and hobby room habitab...
to comply w/ nov# 202546875 to fix the boards in front of the staircase to the entrance of the residence. less than 50% repair.
(n) front steps, fence & gate
commerical ti for coffee shop to include reconfiguration of coffee shop. replace all millwork, refinish floor and paint wall. remodel bathroom to be ada complaint. no exterior work
like for like bathroom remodel approx 100 sq ft, replace existing tub and shower toilet and vanity, no change to layout, no structural work.
to obtain final inspection for work approved under pa# 202211035797. all work is complete.
to obtain final inspection for work approved under 202204081915. all work is complete
revision to 202509054679, 202505297476, 202503252971, 202407166590. omiting 3rd floor wet bar, 3rd floor powder room to full bath & ground floor electrical work.
re-roofing, no hot works.
verizon: install 6 (n) antennas within radomes; install 6 (n) rrus; install (n) cabinet with batteries; install (n) 200a electrical panel
bathroom and kitchen remodel in kind like for like 2nd flr.
repair dameded front door area & lobby. concrete masion unit wall, electrical, elevator, lobby lighting, mail box repair. tile walkway, repair security system repair, garage storage repair & hvac syst...