Building Permits in ZIP 94117
San Francisco, CA — 261 permits filed recently
261 permits
revision to pa 202501067763 & 202510308521 revised structural drawing & details
unit #2: retile bathroom floor and walls, including walls around bathtub. retile kitchen backsplash. replace (3) windows in kind, street facing.u-factor 0.27 max
interior remodel to units 254b and 258b central ave. remodel kitchen and bath only,remove bearing walls.
recommencement and completion of work approved under pa# 201912189922
renovate exterior stairs (less than 50% repair) at east side of the bldg to meet sb 721, add balusters and handrail. add pickets and graspable handrail to existing guardrail.
remodel retail, new restroom, new coffee bar. deferred health submittal
interior remodel to 1497 oak st (3rd floor) only.relocate kitchen,convert(e)kitchen to home office, remodel(e)bath, add one bath and laundry,move non-bearing walls.
2nd & 3rd fl ref pa #2025-1125-0385: fire sprinkler as built
unit #1: replacing (4) windows. all windows are street facing. we are keeping the grids, fdl, like for like operations. no size changes. u-factor < .27 (e) vinyl - 4x double hung (n) fibrex - 4x doubl...
replacing 10 windows ,4x street facing, 6x non street visible, (e) wood- 10x double hung, (n) aluminum clad wood, 10x double hung. like for like. all windows are in kind same opening. u factor <0.27.
recommencement and completion of work approved under pa#201907105536
install electric wall sign "acai raya"
replace fire alarm system to meet sf/ca codes and add lf horns in units & add wireless radio monitor
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
legalize unauthorized dwelling unit at the ground floor per government code section 658.52.2 (state adu program) in response to planning enforment case 2015-001328enf re-instate pre-existing garage do...
yogurt shop: counter, sink, bathroom remodel. the project includes a change of occupancy from the existing occupancy to b
install fire sprinker system to complete work done for permit 202106172717
kitchen and bathroom remodel in kind, no change to sq.ft. refinishing of (e) ground level storage area - new interior materials and new interior walls, new window within (e) opening of swing door, new...
revision to 202503071851. rerouting piping on 4th floor and provide as built plan to fire permit.
revision to pa 202502059700 install steel moment frame @ rear of 1st fl; replace foundations @ 1st fl - no slab level change; replace foundation for 3 garage posts