HVAC Permits in Brooklyn, New York
743 hvac permits filed recently
743 permits
BOILER WORK TYPE TO BE FILED IN CONJUNCTION WITH ALT2#301478719. Work to be done under ALT2#301478719.
Remove gas piping, boiler ( install elec hvac), hot water heater and replace waste line in cellar, remove all bakery equipmets @first floor, install new sink, elec. hot water heater. no change of use,...
Renovation of existing cellar, basement, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in cellar; no chan...
Here to file boiler equipment work type to register (6) residential combi-boiler as per plan in conjunction with plumbing work #b01360076-s1. no change in use, egress or occupancy.
Renovation of existing cellar, basement, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in cellar; no chan...
Replace boiler, h.w.h.,bathroom and kitchen fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Here to file boiler equipment work type to register (6) residential combi-boiler as per plan in conjunction with plumbing work #b01360076-s1. no change in use, egress or occupancy.
Remove gas piping, boiler ( install elec hvac), hot water heater and replace waste line in cellar, remove all bakery equipmets @first floor, install new sink, elec. hot water heater. no change of use,...
Hvac installation for an existing 2 family, 2 story and basement townhouse. no change in use, bulk, occupancy or egress.
Filing for new mechanical HVAC split units as per plan
Replace gas train and reconnect existing gas line to replacement boiler / burner .
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH. (Installation of new HVAC systems, including heating and cooling units, associated condensers, mechanical exhaust systems, and exhaust ductwork and as...
Due to new owner install new bathroom at 1st & 2nd floor ,relocating kitchen,change of boiler oil to gas & replace all plumbingfixture, conjunction with gc job b01327519-i1
Replace burner on existing boiler. No change in use, egress or occupancy.
Decommission and abandon in place existing indirect domestic water heaters, recirculation pump, and associated piping with valves; provide new domestic water and gas piping from the cel to a new boile...
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change of use, occupancy or egress
Installation of hvac blower units on 2nd floor and hvac condensing units at rear yard with access metal ladder at rear of building
Filing for new mechanical HVAC split units as per plan
Filing for new mechanical HVAC split units as per plan
Installation of hvac blower units on 2nd floor and hvac condensing units at rear yard with access metal ladder at rear of building