HVAC Permits in Brooklyn, New York
743 hvac permits filed recently
743 permits
Hvac installation for an existing 2 family, 2 story and basement townhouse. no change in use, bulk, occupancy or egress.
Replace gas train and reconnect existing gas line to replacement boiler / burner .
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change of use, occupancy or egress
Filing for new mechanical HVAC split units as per plan
Replace burner on existing boiler. No change in use, egress or occupancy.
Due to new owner install new bathroom at 1st & 2nd floor ,relocating kitchen,change of boiler oil to gas & replace all plumbingfixture, conjunction with gc job b01327519-i1
Filing for new mechanical HVAC split units as per plan
SUBSEQUENT MECHANICAL APPLICATION FILED HEREWITH. (Installation of new HVAC systems, including heating and cooling units, associated condensers, mechanical exhaust systems, and exhaust ductwork and as...
Scope of work includes the replacement of gas boilers and associated piping and ductwork.
Replace (1) existing 7 modules boiler with 4 new boilers in the 4fl boiler room, in conjunction with the pl work type b00923361. 1 boiler registered in the b00923358-i1, 3 boilers registered in the b0...
Scope of work includes the replacement of gas boilers and associated piping and ductwork.
Replace (1) existing 7 modules boiler with 4 new boilers in the 4fl boiler room, in conjunction with the pl work type b00923361. 1 boiler registered in the b00923358-i1, 3 boilers registered in the b0...
Plumbing work at exist. (4) apartments units on 2nd & 3rd floors; new apartment on first floor & cellar space, (5 bathrooms and 5 kitchens); boiler & meter rooms on cellar, scope of work transferred f...
Renovation of existing cellar, 1st and 2nd floor with plumbing work: relocate kitchen and bathroom fixtures; new 2-pc restroom, washer, dryer, boilers and hot water heaters on cellar; no change in use...
Installation of temporary chimney, 8 steam, 2.5 condensate, and 1make-up water piping to connect temporary mobile boiler trailer and existing heating plant located in the boiler room of the building....
Interior removal & build out for HVAC system & related piping as shown on drawings. Full EN package filed in BIS, application # 340725941. No change in use, egress or occupancy.
Mechanical modifications to include hvac replacement and replacement of associated ductwork. no change of use, occupancy or egress under this application.
Nycha boiler - existing 320 hp boilers to be removed by contractor. removebreeching, steam and condensate return piping to existing boiler, associated valves, fuel oil pipes, controls and supports.
Replace (1) boiler and (1) hot water heater for an existing building. no change the use, egress or occupancy.
Scope of work includes the replacement of gas boilers and associated piping and ductwork.