Demolition Permits in Manhattan, New York
930 demolition permits filed recently
930 permits
Installation of new demising wall in existing retail space only. There is no demolition work under this application.
Demolition of the existing convenience stair and restoration of the floor slab.
Interior non-structural demolition as shown on plans filed herewith.
Temporary standpipe in conjunction with interior demolition filed in M01241994-I1.
Interior demolition of mechanical systems, as shown on plans filed herewith
Demolition of the existing convenience stair and restoration of the floor slab.
Interior non-structural demolition as shown on plans filed herewith.
Interior Renovation including selective demolition, new partitions, updated finishes and required MEP Adjustments per plans. No change to use, Egress, occupancy or Building Envelope.
Installation of new demising wall in existing retail space only. There is no demolition work under this application.
Interior demolition of non load bearing partitions on the 20th floor as indicated on drawings.
Interior demolition of mechanical systems, as shown on plans filed herewith
Interior demolition and construction of non-load bearing partitions, ceilings & finishes in a commercial space - store a. first floor & cellar only - as per plans.no structural work.no change in use,...
Temporary standpipe in conjunction with interior demolition filed in M01241994-I1.
Renovation of residential lobby. Minor demolition and carpentry. No change in use, occupancy or egress.
Proposed to cut, cap and demolish sprinkler system in conjunction with full demo job # m01249911. no change to use, egress or occupancy under this application.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (23rd Floor-Orrick-Buildout) as per plans. No change to use, egress or occupancy.
full demolition of 14 story structure using hand held and mechanical means to assist
General construction including demolition of non-bearing interior partitions and finishes and new finishing work, as shown on plans filed herewith. No change in use, egress, or occupancy.
Structural demolition and phasing associated with elevator shaft work.
Respectfully filing for sprinkler work which includes: demolition of existing limited area sprinkler system installation of new limited area sprinkler system.