Demolition Permits in Manhattan, New York
930 demolition permits filed recently
930 permits
chute will be installed in accordance with approved demolition plans. Mechanical means equipment to be used in accordance with approved demolition plans.
General construction including demolition of non-bearing interior partitions and finishes and new finishing work, as shown on plans filed herewith. No change in use, egress, or occupancy.
chute will be installed in accordance with approved demolition plans. Mechanical means equipment to be used in accordance with approved demolition plans.
Renovation of residential lobby. Minor demolition and carpentry. No change in use, occupancy or egress.
Respectfully filing for sprinkler work which includes: demolition of existing limited area sprinkler system installation of new limited area sprinkler system.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the (23rd Floor-Orrick-Buildout) as per plans. No change to use, egress or occupancy.
Structural demolition and phasing associated with elevator shaft work.
Proposed to cut, cap and demolish sprinkler system in conjunction with full demo job # m01249911. no change to use, egress or occupancy under this application.
full demolition of 14 story structure using hand held and mechanical means to assist
Demolition and Construction of Partitions, Doors, Millwork, Wall & Floor Finishes, Patch Existing Ceiling and Renovate Existing Pantry on Part of the 11th Floor. No Change to Occupancy, Use or Egress...
A.demolition of existing interior partition walls.b.removal of existing floor tiles. no change in use, egress or occupancy under this application.
Demolition and Construction of Partitions, Doors, Millwork, Wall & Floor Finishes, Patch Existing Ceiling and Renovate Existing Pantry on Part of the 11th Floor. No Change to Occupancy, Use or Egress...
Interior alteration to existing apt. 6b on the 6th floor. general construction work, demolish and construct non-structural interior partitions, doors, finishes. renovate ex. bathrooms and kitchen. no...
Minor demolition with installation of new partitions, doors, ceilings and finishes on the 18th and 19th floors (TD Securities- Marketing Floors 19 & 20) as per plans. No change to use, egress or occup...
Filing herewith interior demolition in cellar unit 1B bathroom as per plans filed herewith. No change to use, egress or occupancy.
Interior build-out of apartment #3. Work to include non-structural demolition, general construction, and finishes, as per plans filed herewith.
Interior renovation within the limits of apt 36-d only. no demolition of structural elements. no change of use, egress or occupancy.
FILING FOR DEMOLITION OF METAL STAIR FROM 35th TO 39th FLOOR, INFILL OF EXISTING SLAB OPENING ON 36th THROUGH 39th FLOORS WITH NEW SLAB CONSTRUCTION AS PER PLANS SUBMITTED HEREWITH.
Mechanical Equipment Use for Interior Demolition
Perform minor interior partition demolition & construction inconjunction with apt#3j renovation. remodel kitchen, create pantry area & upgrade bathroom. create new masonry opening for kitchen hood exh...