2,378 hvac permits filed recently
2,378 permits
125/25 replace existing conventional hot water heater with two condensing hot water boilers. with direct vent & intake air all connected to existing hot water tanks and gas piping.
Fit out of the 20th floor construction/23rd floor marketing with new supply, return, and exhaust ductwork. New AC units, VAV boxes, and exhaust fan as per plans filed herewith. No…
Modification to existing mechanical system on the 8th floor as per drawings filed herewith. no change to use, occupancy, or egress
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.