2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Minor partition and lighting work in suite 301. No change to use, egress or occupancy.
General construction modifications taking place on the 18th floor (19th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Plumbing modifications to floors 9 & 10 as per plans filed herewith. No change in use, egress, or occupancy.
New stair opening at 17th Floor and new convenience stair between 16th & 17th Floors as shown on drawings. No change in use, egress or occupancy.
Illuminated non-advertising accessory wall sign - citibank. no change of use, egress or occupancy.
Construction modifications taking place on the 6th floor (8th floor Marketing) as indicated on the drawings.
Plumbing work on the 6th and 7th floor (Sony/Sharp) as indicated on drawings.
Replace plumbing fixtures with new at existing roughing (25 lav, 25 wc), cap & remove (25 tubs), and install new plumbing fixtures at new roughing (25 showers) on the 5th floor.
Mechanical work for ING Financial on 10th and 11th floor
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Filing herewith Mechanical work on the 13th FL. as per plans filed herewith. No change to use, egress or occupancy.
Alterations to sprinkler system on 15th floor as per plans. No change to use. egress or occupancy.
Mechanical modifications taking place on the 6th floor (8th floor marketing) as indicated on the drawings.
Interior renovation of the 5th floor totaling approximately 9, 276 s.f. as per drawings herein. no change to use, egress, or occupancy involved under this application.
Installation and removal of Sprinkler fixtures along with related piping.
General Construction taking place on the 9th Floor as per plans filed herewith. No change in Use, Egress or Occupancy.
Modifications to the existing standpipe system on the 34th floor as per plans. No change to use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Installation of temporary sidewalk shed as per plans. overhead protection shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this appl…