3,364 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,364 permits
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2014 building codes, chapter 33. no changes in use, egress, or occupancy.
Ereect illuminated accessory business d/f blade sign-a @7th ave elevation as per drawing file herewith
Plumbing modifications on 3rd floor related to office renovations
Sprinkler head changes as indicated on plans.
IRA Rope Access Facade Inspection
Proposed installation of 1 illuminated, non flashing, accessory business sign. wording central perk coffee co.
Telehandler to install facade panels
Office interior renovation at 6th floor. interior renovation including installation of interior non-loading partitions, ceiling tiles, millwork, cabinetry, furniture, and finishes.…
Modifications to the existing plumbing system on the Cellar & 3rd floor (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Plumbing and sprinkler modifications to accommodate alterations within the existing building as per plans.
Modification of existing sprinkler system as per drawings filed herewith. no change to use, occupancy, or egress
Plubming work to apt. 1001 & 1002. Remove and replace plumbing fixtures with new, new finishes. No change in egress occupancy or use.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 30 through 33. Construction costs and filing fees included in full-floor Mechanical job # M01293952-S1.…
Remove plumbing and sprinkler fixtures.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy.the custom color sidewalk shed at west 56th street and 5th avenue elevation…
Alterations to mechanical system on 15th floor as per plans. No change to use, egress or occupancy.
Exterior renovation of facade on the 1st - 5th floors as per plans. No change to use, egress or occupancy.
Renovation to existing space on 2nd floor. no change to use, occupancy or egress.
Installation of a new sprinkler system on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.
Installation of new plumbing fixtures and associated piping on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.