3,364 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,364 permits
General Construction to take place on the 9th floor Construction floor as per plans filed herewith. No change in use, egress, or occupancy.
supported scaffold installation
Inspection and repair of facade where required in order to maintain building.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 09 through 11. Construction costs and filing fees included in full-floor Mechanical job #M01294935-S1.…
Plumbing modifications taking place on the 29th fl Con/30th fl marketing floor as per plans filed herewith. No change in use, egress or occupancy
Installation of heavy duty sidewalk shed as per plans. no change in use, egress or occupancy.
Roofing replacement above structural deck as per plans filed herewith.
Provide structural support for folding partition on the 11th floor for ing financial
Removal and installation of interior partitions and doors on floors 4-6 as per plans submitted herewith. No change of use, occupancy or egress under this application.
Underground plumbing with plans filed herewith in conjunction to the NB (M00505081)
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancy
sprinkler & standpipe work
Early-phase Mechanical modifications to fan powered boxes and fans on Floor 19. Construction costs and filing fees included in full-floor Mechanical job #M01293917-S1. No change in…
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 20 through 23. Construction costs and filing fees included in full-floor Mechanical job # M01293923-S1.…
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 39 through 41. Construction costs and filing fees included in full-floor Mechanical job # M01293994-S1.…
Modification of existing sprinkler system as per drawings filed herewith. no change to use, occupancy, or egress
Alterations to mechanical system on 15th floor as per plans. No change to use, egress or occupancy.
Plubming work to apt. 1001 & 1002. Remove and replace plumbing fixtures with new, new finishes. No change in egress occupancy or use.