3,364 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,364 permits
Mechanical application Filed related to interior renovation of commercial space located on the ground floor, no change to use, egress or occupancy.
Filing herewith HVAC system as per plans filed herewith.
structural work associated with the apron extension for the run of the Broadway Show, Death of a Salesman, as shown on plans filed herewith. no change to use, egress or occupancy.
Sprinkler modifications taking place on the 15th floor (16th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Install new temp loop for cellar & 1st floor as per plans. no change to use, occupancy or egress.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
sprinkler modifications on 18th floor as per plans filed herewith. no changes in use, egress or occupancy.
Structural work for Steptoe on marketing floors 43,44 & 45 (construction floors 42,43 & 44)
General construction modifications on the 19c/20m floor as per plans filed herewith. no change of use, egress or occupancy.
Support of excavation for the construction of a new building as per plans filed herewith.
Modification to existing plumbing system as per drawings filed herewith. no change to use, occupancy, or egress
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 14th floor (marketing floor) / 6th floor (construction floor) as per plans file…
Plumbng system installation for proposed medical office space as per plans, herewithin filed in conjunction with gc application no. m01193571-i1. no change in use, egress or occupa…
Install new awning with canvas cover at storefront reading the best sichuan as per plan. no change in use, egress, and occupancy.
Filed for interior renovation of commercial space located on the ground floor remove/replace non-bearing partitions & finishes as per plans; no change to use, egress or occupancy.
Subsequent application filed for plumbing modifications/additions on the 11th fl (suite 1109 - nosova) as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Modifications to the existing HVAC system on the Cellar & 3rd floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
Structural in conjuction with new building job number # m01042409-i1
Installation of a temporary work platform as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…