3,364 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,364 permits
Installation of temporary barricade as per plan. no change in use, egress, or occupancy. the barricade is at 57th street on the road for loading and 58th street on the road for ped…
Installation of construction fence for new building construction as per plans. no change in use occupancy or egress under this application. construction fence shall comply with cha…
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the custom color shed is in front of the building at west 57th street elev…
Replacement of rare book room ac unit, and library ac unit. no change in use, egress, or occupancy.
Preparation Work for Full Demolition - Interior Demo
Foundation work for the construction of a new building as per plans filed herewith.
Removal of existing T-MOBILE equipment platform with related cabinets, 2 antennas and 2 RRH units.
Mechincal work as shown on filed plans
Sprinkler/Plumbing modifications as per plans filed herewith. No change to use, egress or occupancy.
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Removal and installation of mechanical duct work and related piping as shown on drawings. no change to use, egress or occupancy.
Work to include new plumbing fixtures for new toilet, exam rooms, infusion suites, pantry & toilets. relocation of select sprinkler heads. work on 17th floor interiors only.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. no change in use occup…
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at the west 52nd street, east to the canopy, and west…
Modify existing plumbing fixtures and sprinkler system as per plan.
Installation of engineered enclosure system as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application…
General Construction modifications to take place on the Facade as per drawings filed herewith. No change in use, egress, or occupancy.
Modifications to the existing Sprinkler System: Install (442) new sprinkler heads and associated sprinkler piping on the 3rd Floor as per plans (MUFG Renovations.) No change to use…
Filing herewith for Foundation work in conjunction with New Building M00615380-I1.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or the sidewalk shed is front of the building at 5 avenue elevation.