2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Proposed minor modification of existing plumbing and sprinkler system for apartment 55a, no change in use, egress or occupancy.
General Construction work for interior office renovations on 17th floors as per plans filed herewith. No change to use, egress, or occupancy.
Modification/installation of non load bearing partitions as per plan. no change in use, egress or occupancy.
Application filed for plumbing additions/modifications on the 15th floor (techno) as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing modifications to take place on the 25th floor as shown on plans submitted herewith. No change in use, egress or occupancy.
Interior renovation of existing apartment apt 602. work includes installation of plumbing fixtures. no change no change of use, egress or occupancy.
Inspect site conditions for telecom upgrade
Filing subsequent application for installation of AC unit, 5th floor office space, as per plans.
Interior Demolition of Partitions, Doors, Suspended Ceiling, Millwork, Wall & Floor Finishes on 12th Floor. No Change to Occupancy, Use or Egress is Proposed
Facade repairs. scaffold inspections, 3 men letter
Alterations to existing mechancial systems as per plans filed herewith
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy.
Structural modifications associated with lobby renovation and reframing of 2nd floor mezzanine extents as per plans filed herewith. No change to use, egress, or occupancy.
Removal and instillation of interior non load bearing partitions and related finishes. No change in use, egress or occupancy
Sprinkler Head and Temp Loop changes as indicated on plans.
Mechanical work on the 10th floor (Dublin & Co.) as indicated on drawings
Suspended Scaffold for Facade Restoration as Shown on Plans
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.