3,364 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,364 permits
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of a temporary work platform as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live l…
To modify existing kitchen mechaniacal system to add a new kitchen hood with duct work for exhaust and make up air all as per plans filed herewith
Suspended Scaffold as shown on plans
Removal and installation of mechanical duct work and related piping as shown on drawings. no change to use, egress or occupancy.
Preparation Work for Full Demolition - Interior Demo
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Mechincal work as shown on filed plans
Installation of engineered enclosure system as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application…
Installation of temporary shanty as per dwgs. no change in use, occupancy or egress under this application.
Plumbing/Sprinkler demo and modifications on construction Floor 1, 2, and Cellar as per plans filed herewith. No change to use, egress, or occupancy.
Modify existing plumbing fixtures and sprinkler system as per plan.
Replacement of rare book room ac unit, and library ac unit. no change in use, egress, or occupancy.
Removal of existing T-MOBILE equipment platform with related cabinets, 2 antennas and 2 RRH units.
Interior renovation to existing apartment 27h. removal and installation of interior non-bearing partitions, fixtures, and finishes. no change to use, occupancy, or egress under thi…
Modify standpipe system as per plans. No change in use, egress or occupancy.
Sprinkler modifications taking place at cellar as per plans filed herewith. no change in use, egress, or occupancy.
Installation of suspended scaffold for facade work or inspection.