2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Structural modifications taking place on the 13th (12a marketing) and 14th floors as per drawings filed herewith. no change in use, egress or occupancy.
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Facade repairs. scaffold inspections, 3 men letter
Installation of 300 psf sidewalk shed, construction fence, roof of protection and ohp via needle beam as per plans. all equipment shall comply with chapter #33 of the 2022 code. no…
Application filed for sprinkler additions/modifications on the 15th floor (techno) as per plans filed herewith. no change in use, egress, or occupancy.
Preparation Work for Full Building Demolition - Interior Demolition
Sprinkler work taking place on the 1st floor as per plans filed herewith. no change in use, egress, or occupancy.
Sprinkler modifications taking place on the 7th floor as indicated on the drawings.
Mechanical work on the 10th floor (Dublin & Co.) as indicated on drawings
Sprinkler modifications to take place on the 25th floor as shown on plans submitted herewith. No change in use, egress or occupancy.
IRA Rope Access Facade Inspection
Structural modifications associated with lobby renovation and reframing of 2nd floor mezzanine extents as per plans filed herewith. No change to use, egress, or occupancy.
Application filed for structural modifications on the 15th floor & partial 16th floor (techno). work includes removal of convenience stair and infill of concrete slab. no change in…
Suspended Scaffold for Facade Restoration as Shown on Plans
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy.
Alterations to existing mechancial systems as per plans filed herewith
Filing herewith sprinkler work in conjunction with renovation of existing office as per plans. no change in use, egress or occupancy.
Sprinkler Head and Temp Loop changes as indicated on plans.