2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Interior removals work at 8m/8c floor including partition, ceiling and door removals as per plans. no change in use, egress or occupancy.
removal of pre-action sprinkler and associated panel.
Plumbing work as shown on plans filed herewith. No change to use, egress or occupancy.
Erect sign tag as non-illuminated plate letter (sign 4) @ east 50th street elevation santader with logo
Modifications to the existing HVAC system on the Cellar, 1st - 5th floors (Nike - HOI) as per plans. No change to use, egress or occupancy
Modifications to the existing mechanical system. No change in use, egress or occupancy.
Removal and instillation of interior non load bearing partitions and related finishes. No change in use, egress or occupancy
Plumbing modifications taking place on floor 001 as per plans filed herewith. No change in Use, Egress or Occupancy.
Plumbing modifications taking place on the 3rd floor as per plans filed here with. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Sprinkler modifications taking place on the 3rd floor as per plans filed herewith. No change in use, egress or occupancy._
Interior renovation and installation of commercial exhaust system for take out pizzeria, no change in use occupancy or egress
Minor Interior Demolition on Cellar,1-5 floors as per plans. No change to use, egress or occupancy.
Filing ms for 8th floor interior renovation - construct new offices, pantry as per plan.
Installation of temporary const. plywood fence and heavy duty sidewalk shed as per plans. sw shed and plywood fence shall comply with chapter #33 of the 2022 code. no change in use…
Alterations to existing PL/SP Systems as per plans filed herewith
Plumbing work for IFM Investors on construction floors 17 & 18 (marketing floors 18 & 19)
Installation of temp Tent, platforms, no alt to exist structures for Tony Awards Red Carpet. A TPA permit is required. Producer is responsible to monitor site safety & implement HW…
General Construction demolition work taking place on floors 001-003 as per plans filed herewith. No change in Use, Egress or Occupancy.
Modifications to the existing HVAC System: Relocate ductwork and linear diffusers on the 25-26 and 28th Floors as per plans (DLA Piper Renovations.) No change to use, egress or occ…