2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Interior renovation existing commercial space with partition work on 1st floor and mezzaine. no change in use, egress or occupancy.
FILING GC FOR 8TH FLOOR INTERIOR RENOVATION, Construct New Offices, Pantry as per Plan. NO Change in use, Egress, or Occupancy
Installation of new plumbing systems in accordance with the plumbing plans. no change to zoning, use, egress, or occupancy under this application.
Installation of shoring for truck corridor
General Construction to take place on the 25th floor as per drawings filed herewith. No change in use, egress, or occupancy.
Facade repairs include, but not limited to brick repair, repointing, lintel repair & waterproofing, stone repair, terra cotta repointing, sill replacement as per plans filed. No ch…
Mechanical modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
Herewith filing for demolition of the subcellar #1 as per plans. no change to use, occupancy, or egress under this application.
Structural in conjuction with new building job number # m01042409-i1
Modification to plumbing and sprinkler systems as per plans filed herewith.
Herewith filing for interior demolition of existing mechanical systems in subcellar #1 as per plans. no change to use occupancy or egress.
Hereby filing for the installation of a new mechanical unit and associated ductwork in conjunction with the interior renovation of an existing commercial space. There is no change…
Sprinkler modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
Replacement of 3 ton split ac system serving front east office and 2nd fl
Filing herewith to add hold opens connected to the fire alarm at two existing doors on the 5th and 6th floors.
Sprinkler modifications taking place on floors 001-002 as per plans filed herewith. No change in Use, Egress or Occupancy.
Filing for partition work related to a new place of assembly on the 22nd floor and to remove an existing place of assembly on the 23rd floor.
General construction work to include construction of interior partitions and installation of doors and frames as shown on drawings. No change to use, egress or occupancy.
General construction modifications taking place on the 32nd floor (33rd floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Installation of a temporarily supported scaffold and roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occu…