2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
General construction modifications taking place on the 32nd floor (33rd floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Herewith filing for demolition of the subcellar #1 as per plans. no change to use, occupancy, or egress under this application.
Construction modifications taking place on the 7th floor as indicated on the drawings.
Installation of new plumbing systems in accordance with the plumbing plans. no change to zoning, use, egress, or occupancy under this application.
Installation of shoring for truck corridor
Modifications to the existing HVAC System: Relocate ductwork and linear diffusers on the 25-26 and 28th Floors as per plans (DLA Piper Renovations.) No change to use, egress or occ…
Structural modifications to floor 1 as per plans filed herewith. No change in use, egress, or occupancy.
Sprinkler modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
Filing pl/sp for 8th floor interior renovation, new offices, pantry, conference room, & bathrooms as per plan. sprinkler heads as per plan.
Hereby filing for the installation of a new mechanical unit and associated ductwork in conjunction with the interior renovation of an existing commercial space. There is no change…
Replacement of 3 ton split ac system serving front east office and 2nd fl
Herewith filing for interior renovation of existing retail store as per plans.
Plumbing and sprinkler work related to the interior renovation of existing commercial space on the second floor. no change in use, egress, or occupancy.
minor demo of mechanical systems (20th floor) and installation of new ductwork on the 21st floor (Highlife) as per plans filed herewith. No change to egress use or occupancy.
Facade repairs. no change in use, egress or occupancy.
The proposed work is for installation of plumbing fixtures on the 10th. floor.
Slab opening and new stair from the 20th floor to the 21st floor (HIGHLIFE) AS PER PLANS. No change to use, egress or occupancy
Removal of existing hvac system in existing rooms and new hvac design for new restrooms and rooms.
Structural modification as per plans. No change to the use, egress or occupancy.