2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Construction work on the 10th floor (Dubin & Co.) as indicated on drawings.
Installation of construction plywood fence, heavy duty sidewalk shed and overhead protection shed as per plans during construction. no change in use, egress or occupancy. temporary…
Mechanical modifications taking place on the 3rd floor as per plans filed here with. no change in use, egress or occupancy .
Replace existing non-illuminated sign (neuberger)
Modifications to the existing mechanical system. No change in use, egress or occupancy.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Plumbing work associated with renovation of apt 27h, including replacement/relocation of toilets, lavs, showers, tub, sink, and washer/dryer as per plans submitted herewith. no cha…
Interior work as per plans. No change in egress use or occupancy
Installation of plumbing fixtures and commericial cooking equipment for take out pizzeria
Filed pursuant to article i, chapter v of the nyc zoning resolution and article 7b of the nys multiple dwelling law for residential conversion including partial demolition and perm…
Modifications to the existing sprinkler system with installation of a temporary loop on the 31st floor (Electra USA) as per plans. No change to use, egress or occupancy.
Fit-out of a 6,000 sf (approximate) office space including but not limited to the construction and installation of interior partitions wall for office space and finishes in 15th fl…
Filing herewith mechanical work in conjunction with renovation of exisitng office as per plans. no change in use, egress or occupancy.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Suspended scaffolding for facade restoration as shown on plans
Selective removals of non-load bearing partitions, flooring, wall bases, millwork cabinetry/shelving, doors and finishes as per details on plans.
Replace plumbing fixtures with new at existing roughing (1 wc, 1 lav) at apt 37b on the 36th floor.
Mechanical modifications to take place on the 25th floor as shown on plans submitted herewith. No change in use, egress or occupancy.
Mechanical work on the cellar, 1st thru 19th floors and roof as indicated on drawings.
Filing for structural and general construction repairs to this existing parking garage. No change to use, occupancy or egress.