2,817 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
2,817 permits
Mechanical modifications to take place on the 25th floor as shown on plans submitted herewith. No change in use, egress or occupancy.
Modifications to the existing mechanical system. No change in use, egress or occupancy.
Sprinkler modifications taking place on the 13th and 14th floor ( 12a and 13th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Facade repairs. no change in use, egress or occupancy.
Replace plumbing fixtures with new at existing roughing (1 wc, 1 lav) at apt 37b on the 36th floor.
Modifications to the existing sprinkler system with installation of a temporary loop on the 31st floor (Electra USA) as per plans. No change to use, egress or occupancy.
Filing for structural and general construction repairs to this existing parking garage. No change to use, occupancy or egress.
Removal of existing hvac system in existing rooms and new hvac design for new restrooms and rooms.
Plumbing work associated with renovation of apt 27h, including replacement/relocation of toilets, lavs, showers, tub, sink, and washer/dryer as per plans submitted herewith. no cha…
Selective removals of non-load bearing partitions, flooring, wall bases, millwork cabinetry/shelving, doors and finishes as per details on plans.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Construction work on the 10th floor (Dubin & Co.) as indicated on drawings.
Installation of construction plywood fence, heavy duty sidewalk shed and overhead protection shed as per plans during construction. no change in use, egress or occupancy. temporary…
Interior work as per plans. No change in egress use or occupancy
Mechanical modifications taking place on the 3rd floor as per plans filed here with. no change in use, egress or occupancy .
Filing herewith mechanical work in conjunction with renovation of exisitng office as per plans. no change in use, egress or occupancy.
minor demo of mechanical systems (20th floor) and installation of new ductwork on the 21st floor (Highlife) as per plans filed herewith. No change to egress use or occupancy.