Plumbing: Modifications to the existing plumbing system on the (23rd Floor- Orrick) as per plans. No change to use, egress or occupancy.
Sprinkler modifications on 40th in conjuction with alt-1 as indicated on plans filed herewith.
Modification to existing Sprinkler system as per plans filed herewith.
Installation of heavy duty sidewalk shed as per chapter 33 of NYCBC. No change in use, egress, or occupancy
Propose installation of new plumbing fixtures and sprinkler heads with associated sprinkler branch piping. No change in use, egress or occupancy.
Installation of new partitions, doors, ceilings and finishes on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
Mechanical Systems alteration of existing rooftop HVAC equipment per plans.
Filing pre-build work as per plans filed. no change to use, egress or occupancy.
Filing herewith plumbing work as per plans filed herewith. No change to use, egress or occupan
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Removal and installation of interior partitions and doors on floors 4-6 as per plans submitted herewith. No change of use, occupancy or egress under this application.
1.interior renovation of first floor and cellar level of existing retail space. modification of existing sprinkler system work to include the relocation of existing heads, cap non-…
Installation of a new HVAC system on the 41st and 42nd floors (Woodline- Marketing Floors 43 & 44) as per plans. No change to use, egress or occupancy.
Install new sprinkler heads and related piping as shown on drawings. No change in use, egress or occupancy.
Plumbing work as per plans filed. no change to use, egress or occupancy.
Filing for interior demo of non-load bearing partitions, floors and ceiling as per plans filed. no change to use egress or occupancy.
Support of excavation work associated with the foundation work for the nb #m01093960-i1
Herewith filing for interior ms work as per plans filed. no change to use, egress or occupancy.
Installation of plumbing fixtures on the fourth floor. no change to use egress or occupancy.
Associated mechanical work for replacement steam fired semi-instantaneous domestic water heater (dwh-1). install replacement dhw supply piping, recirculation pump, dhw recirculatio…