3,426 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,426 permits
interior modification to the retail layout of the 1st and 2nd floor CVS retail tenant spaces. remove non-load bearing metal stud walls, relocate retail fixtures, replace floor and…
Preparation Work for Full Demolition - Removal of Rooftop Equipment
Hereby filing for plumbing scope related to the interior renovation. no change to use egress or occupancy.
Earthwork worktype associated with site clearing the site and proposed excavation for a future development. no change in use, egress or occupancy.
Proposed interior renovation at 014 floor as per plans. no change in use, egress, and occupancy. mechanical, sprinkler and plumbing to be filed separately.
Proposed interior renovation at 003 floor as per plans. no change in use, egress, and occupancy. mechanical, sprinkler and plumbing to be filed separately.
Modification to existing Plumbing fixtures as per plans filed herewith
Installation of plumbing fixtures on the fourth floor. no change to use egress or occupancy.
Hereby filing Phase i and Phase II of localized masonry repairs on the building exterior as shown on plans filed herewith. No change to use, occupancy or egress.
Interior alteration of apartment 13c with new partitions, finishes, and doors
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Removal of mechanical ductwork, diffusers, fans and related mechanical piping as shown on drawings. no change to use, egress or occupancy.
Associated mechanical work for replacement steam fired semi-instantaneous domestic water heater (dwh-1). install replacement dhw supply piping, recirculation pump, dhw recirculatio…
Mechanical system installation for proposed medical office space as per plans here within. No change it egress, use or occupancy
Install of temp tents, no alt to exist structures for Seasonal Bryant Park Grill. A TPA is required. Producer is responsible to monitor site safety & implement HWAP. All production…
Combine apartments 1001 & 1002 as per PPN 3/97. Remove & erect minor interior partitions, remove and replace plumbing fixtures with new, and new finishes. No change in egress occup…
Mechanical systems alterations in existing bldg - installation of split system heat pumps on roof
Herewith filing for related plumbing work as per the plans.
Remove mini split units, associated piping and registers and diffusers from removed rooms.