3,426 issued permits in Midtown-Times Square, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
3,426 permits
Removal of sprinker system and conversion of standpipe system to pressurized dry system in assoasition with full building demolition, by others. there is no change to use, egress,…
Herewith filing for interior ms work as per plans filed. no change to use, egress or occupancy.
Hereby filing for plumbing scope related to the interior renovation. no change to use egress or occupancy.
Underpinning scope as part of early foundation work for the nb #m01093960-s1
Mechanical modifications taking place in the cellar as per plans filed herewith. No change in use, egress or occupancy
General construction modifications taking place in the cellar as per plans filed herewith. No change in use, egress or occupancy
Sprinkler modifications as per plans filed herewith. no change to use egress or occupancy.
Filing for mechanical work associated with 17th & 18th floor thomson reuters office as per plans submitted herewith.
Filing for interior renovation of 17th and 18th floor thomson reuters office as per plans submitted herewith.
Installation of temporary construction fence as per plans. no change in use, occupancy or egress.
Removal and construction of interior partitions, doors and ceilings as shown on drawings. No change in use, egress or occupancy.
Connection to base-building supply and duct work distribution. Installation of two water cooled computer room ac unit and one water-cooled ac unit for boardroom.
Interior renovation of hotel units on the 17th, 18th, 19th, 20th, & 21st floors. partition changes and cosmetic work as per plans. no change in use, occupancy or egress.
Facade restoration as per plans filed herewith. No change to use, egress or occupancy
Application filed for interior removal of non-load bearing partitions, ceilings, and finishes on the 11th, 18th, & 19th floors as per plans filed herewith. no change in use, egress…
plumbing work for office fit out for Cumming Group on 12th floor
9th Cycle Facade Repair Program. No change to use, egress or occupancy.
The removal of (2) existing 310 ton steam absorption chillers and theinstallation of (2) new 310 ton electric centrifugal machines., a new sidestream sand filter on the condenser w…
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Interior renovation at existing hotel lobby on 1st floor as per the plan filed herewith. no change in use, occupancy or egress.